Unplanned outages and reduced output

The table lists all unplanned outages of VERBUND-power plants > 100 MW.

The information about planned day-ahead availability is published on the Transparency Platform of the European Energy Exchange (EEX).

The status is updated as soon as information is available.

07/16/2018 03:50 PM

Power plant block Failed output Start End Status
Gerlos MS5 135 MW 07/16/2018 12:08 PM 07/16/2018 03:50 PM