Mühldorf Run-of-River Power Plant

VERBUND's power plant at Mühldorf is a run-of-river plant situated in the municipality of Mühldorf in Carinthia.

Technical Description 

The Mühldorf run-of-river power plant was built between 1922 and 1924. The power plant was originally conceived to contain three machine units, of which, only two would be put to use. These two machine units are made up of a Francis turbine and a three-phase current- synchronous generator each, which annually generate an average of around 2 GWh of electricity.

Technical data:

Owner: VERBUND Hydro Power GmbH
Operating company: VERBUND Hydro Power GmbH
Beginning of operation: 1925
Type:  Run-of-river
Country, State: Austria, Carinthia
Waters: Mühldorfer Seebach
Capacity: 0,6 MW
Annual generation: 1.999 MWh
Turbines: Francis (3)
Fish bypass: no