Take a look behind the scenes of Austrias and Bavarias largest hydropower electricity producer
Visit our power plants
Take a look behind the scenes of Austrias and Bavarias largest hydropower electricity producer
supplies the Mühldorf power plant
1,470 avoided tonnes of CO2*
Â
Owner | VERBUND Hydro Power GmbH |
---|---|
Operator | VERBUND Hydro Power GmbH |
Commissioning | 1925 |
Type | Run-of-river power plant |
Country | Austria |
Region | Carinthia |
Waters | Drava, Mühldorferbach |
Output | 01 MW |
Annual output | 1,999 MWh |
Turbine | Francis |
Connectivity | No fish bypass |