Bischofshofen Run-of-River Power Plant

Bischofshofen joint venture power plant is a run-of-river power plant situated on River Salzach in the municipal area of Bischofshofen in Salzburg.

The Bischofshofen community power plant is a run-of-river power plant located on the Salzach and in the municipal district of Bischofshofen in Salzburg. Bischofshofen was the first link in the power plant chain on the Salzach and was built between 1982 and 1985. Two Kaplan turbines generate over 70 GWh annually.
 
Please accept marketing-cookies for this website displaying Google Map.

Image from the Location

Owner VERBUND Hydro Power GmbH, Salzburg AG
Operator Salzburg AG
Commissioning 1986
Type Run-of-river power plant
Country Austria
Region Salzburg
Waters Salzach
Output 16 MW
Annual output 70,200 MWh
Turbine Kaplan
Connectivity Fish bypass
Environmental protection at VERBUND

Ecology & environmental protection

In 2015, the existing fish bypass at the site was modernised and brought up to the latest state of technology. Due to space constraints, an innovative prefabricated system – an enature multi-structure slot fishpass – was used. The special feature of the fish bypass is the slow speed of the flow rate. In this way, juvenile and weaker-swimming species of fish, such as the European bullhead, can migrate through it more easily.
Our latest conservation projects
Turbines and generators: Two Kaplan bulb turbines with a horizontal shaft generate an output of 8,560 kW each with a head of 9.0 metres. The four-blade impellers with a diameter of 3.6 metres have an intake capacity of 111 m³/sec. The two bulb turbine generators have a nominal output of 9,500 kVA. The generators are cooled by means of a closed circuit.

Transformers: Two 9,500 kVA machine transformers raise the generated energy to 30,000 V. Transmission is via a 30 kV line to the medium voltage grid of Salzburg AG. The plant additionally has two 400 kVA transformers to cover its own requirements.

Weir system: In order to control the three-field weir system, welded pressure segments in the box design with weir flaps are used. With a clear width of 10 metres, the gates enable a dammed height of 10.6 metres. The system is power oil-hydraulically by means of Rexroth weir hydraulics.